Serbian cyrillic Serbian latin English
Home Services References About Us Our Team Contact

Gazela

Gazela

The “Gazela” Bridge consists of 3 sections:

Approach structures on the left bank

The structure across the river

Approach structures on the right bank

Approach structures on the left bank:

Pre-stressed concrete structures cast on site

Cross-section – box-shaped

Structural system – continuous beams

Total length – main direction 546 m, ascent-descent ramps 146 m

Steel structure of the “Gazela” Bridge:

Total bridge length – 468.50 m

Consists of 3 structural units: the main structure across the river – a supported frame 332.0 m long and 15.3 m high, with inclined piers placed 63.023 m apart from the end piers

Two simple beam structures of the static system over the inundation areas, span 66.8 m, connecting the main steel structure with the approach concrete structures

Location:

Client: