Bridge Over River Sava Near Ostruznica

Bridge Over River Sava Near Ostruznica

Year:

1991 – 1998 – Construction of the main and approach structures

2004 – Rehabilitation of the destroyed structure after NATO bombing
Location: Ostružnica, Serbia
Client: Republic Directorate for Roads
Project value: €60,000,000
€12,000,000
Responsible designers:

Danilo Dragojević, Slobodan Cvetković – steel structure

Staša Mojsilović, Ivanka Kopčalić – approach structures

The bridge is located on the Belgrade bypass on the E70–75 highway.
The total bridge length is 1,787 m. The roadway width is 14.40 m. The main structure, 583 m long, consists of a main span of 198 m and 4 side spans of 3×99 + 88 m. There are six approach structures, each almost 200 m long, with 6–7 shorter spans of 30–35 m. The main bridge is steel with a variable-height main girder. The approach structures are executed as pre-stressed concrete structures with a typical cross-section of four I-girders, 2.1 m high.

The bridge superstructure was severely damaged during the NATO bombing in 1999.
The scope of work included assessing the condition of the bridge structure after the NATO bombing.

Location:

Ostružnica, Serbia

Client:

Republic Directorate for Roads