Steel truss bridge over the Sava River in Obrenovac
Project for the rehabilitation and continuation of works on the bridge over the Sava River in Obrenovac
Year: 2008
Location: Obrenovac, Serbia
Client: "Directorate for Construction Land and Development of Belgrade" JP
Project value:
Project description:
The bridge was originally designed with 4 district heating pipes, φ1000 mm (160 °C), and one traffic lane for maintenance purposes. During construction, the bridge was redesigned to accommodate 2 pipes φ1000 mm and 2 traffic lanes.
The bridge spans are 2 × 51 + 101 + 141 + 2 × 51 m.
Description of executed work:
Main design with workshop documentation