Bridge over the Bračin Landslide on the Belgrade – Niš Highway
Year: 2000/2001
Location: Highway E-75, Serbia
Investor: Republic Road Directorate
Project value: €3,250,000
Project description:
Main construction project for the bridge over the Bračin landslide on the Belgrade – Niš highway.
The total length of the bridge over the landslide is 159 m (6×26.54 m). There are two separate bridges — one for each carriageway of the highway — each with a 12.5 m-wide reinforced-concrete deck cast in place. The main structure consists of nine PN girders of characteristic and cross-sectional height of 14.2 m.
Mostprojekt carried out all required static analyses and calculations, detailed workshop documentation, as well as the bill of quantities and cost estimate.
Scope of work:
Main construction project
Static verification
Construction supervision
Assistance in material procurement